Case Study
Packaging line cycle time reduced by 28%
Industrial automation and mechanical retrofit for a food manufacturer in Turkey.
Challenge
- Legacy packaging line bottlenecks without replacing the entire plant.
Solution
- Mechanical transfer redesign, PLC logic upgrade, HMI alarms for faster response.
Result
- -28% cycle time, -35% unplanned stops, 4-week rollout.
Contact WAARDCO at [email protected] or +90 552 561 8865.